GE DS200TCPSG1A Central Processing Unit (CPU) / Input Module

GE DS200TCPSG1A Central Processing Unit (CPU) / Input Module

Warranty Period: 365 Days
Quality: Genuine Original Product
Condition: Brand New
Warehouse: On-site
Delivery Time: Shipped within 2 weeks after payment
Mailbox: ZHDJIANGJIANG1@gmail.com
Mailbox:  3003988692@QQ.COM

VX:13306931251
CALLME:+8613306931251

0.00
0.00
  

Warranty Period: 365 Days
Quality: Genuine Original Product
Condition: Brand New
Warehouse: On-site
Delivery Time: Shipped within 2 weeks after payment
Mailbox: ZHDJIANGJIANG1@gmail.com
Mailbox:  3003988692@QQ.COM

VX:13306931251
CALLME:+8613306931251

📞 Need Help? Contact Our Siemens Specialists: ZHDJIANGJIANG1@gmail.com

VX:+8613306931251

"Many roducts are not yet listed on our platform. Please contact us for more details.

In case of discrepancies between the product model and displayed images, the model number shall prevail. For specific product photos, kindly reach out to us, and we will arrange for photographs to be taken at our warehouse for confirmation.
With 14 shared warehouses worldwide, we kindly ask for your understanding that accurate responses may occasionally take several hours. Rest assured, we will address your inquiries as promptly as possible."

"Please contact us for the best price. Email: [mailto:ZHDJIANGJIANG1@gmail.com

Mailbox:  3003988692@QQ.COM]

Ensure Peak Turbine Performance and Reliability

Keep your GE Mark VI turbine control system running at its best with the genuine DS200TCPSG1A Central Processing and Input Module. This critical component is the brain of the system, responsible for processing high-speed inputs and executing complex control logic for your gas or steam turbine.

Key Benefits for Your Operation:

  • Genuine GE Component: Guaranteed compatibility, performance, and longevity for your Mark VI system.

  • Maintain Maximum Uptime: Prevent costly shutdowns and ensure continuous power generation or mechanical drive operation.

  • Plug-and-Play Replacement: Minimize downtime with a fully tested, ready-to-install module. Reduces reconfiguration time.

  • Critical Signal Processing: Accurately acquires and processes vital turbine data (speed, temperature, pressure) for precise control and protection.

Ideal for:

  • Power Generation Plants

  • Oil & Gas Facilities

  • Industrial Mechanical Drive Applications